The Waiau Working Party (WWP) was established in 1990 by the Electricity Corporation of New Zealand (ECNZ) and Environment Southland (ES). It was established to assist the Environment Southland Council in the identification of resource use conflicts in the Waiau Catchment leading to the preparation of a resource management plan and the replacements of water rights for hydro power generation which were required as a result of the passing of the Resource Management Act (RMA). The WWP was given a brief to identify, scope and give priority to the resource use issues in the catchment and identify studies necessary to resolve these. Initial members of the Waiau Working Party were: Southland District Council, Department of Conservation, Guardians of Lakes Manapouri, Te Anau and Monowai, Southland Branch of the NZ Jet Boating Assn, Oraka Aparima, NZ Royal Forest and Bird Society, Southland Conservation Board, Te Ao Marama, Tuatapere Districts Promotions, Tuatapere Community Board, Waiau River Liaison Committee, Southland Fish and Game Council, and individuals Jan Riddell (Chair from inception to 2021), Peter Horrell, John Knowler, Cliff Beer, Edward Loose, Fred Inder, Irene Barnes, and Ann McCracken.
ECNZ representatives were responsible for undertaking the research needed to prepare them to apply for consents to continue to operate the power station on Lake Manapouri. Studies were focussed on the effects on Deep Cove, lake marginal vegetation and shoreline stability, phytoplankton growth in the Waiau Arm (Waiau River between Lake Manapouri and the Manapouri Lake control structure (MLC)), management of periphyton growth in the lower Waiau River, erosion in the Upper Waiau River and effects on trout spawning there, effects on physical river and coastal processes, effects on fish life and migration of fish in the Waiau River and effects on bird life in the lower Waiau River.
The studies were funded by ECNZ who reported the results back to the WWP on a regular basis. The data collected led to the development of resource consent conditions and flow management practises that were intended to mitigate adverse effects that were identified. The most significant of these was a lack of adequate flow in the lower Waiau River. A new flow regime based on trout habitat requirements was established and a new fish pass in the MLC was constructed. Other consent conditions to monitor the effects on the areas/ecosystems mentioned above were agreed to.
It was accepted that the new flow regime did not fully restore the river to its natural state or restore fish habitats as much as could be achieved with a higher flow so trusts were established with money provided by ECNZ. These trusts were required to undertake works to make up for some of the losses that were incurred and could not be replaced. The Waiau Fisheries and Wildlife Habitat Trust was established to enhance public access, wetland and freshwater habitats in the Waiau Catchment. The Waiau Mahika Kai Trust was provided with land in the Redcliff catchment and associated buildings to enhance Mahika Kai values in the area. The Waiau Amenities Payment and The Tuatapere Community Trust were established to promote and develop amenities in Tuatapere and assist community groups there. An agreement between Federated Farmers and ES provided an annual sum of money for fencing and river management in the lower Waiau River.
Following the granting of the 35-year consents in 1996 under the RMA the WWP met annually to receive and report to ES on monitoring work undertaken as required under the consents. The most pressing issues have been the control of periphyton in the lower Waiau and control of phytoplankton blooms in the Waiau between the MLC and Lake Manapouri.
In 2010 a memorandum of understanding was signed between the WWP and Meridian Energy to develop and maintain management practises to protect ecosystems in the Waiau Catchment following an amendment to the consents that allowed Meridian to take more water for hydro power generation following the building of the second tailrace tunnel, the Manapouri Te Anau Amended Discharge consent. WWP members were concerned that this new consent would have further adverse effects on the river. A significant part of the agreement was a 7-year review of the monitoring programme to ensure it was effective and allowed for changes if further adverse effects were found. The Memorandum focussed monitoring work on issues that earlier monitoring found to still need a resolution. A formal programme of flushing flows for the lower Waiau was established and rigorously monitored with changes made annually to reduce periphyton biomass in the river. In 2004 didymo, an invasive, mat forming alga, was discovered in the river. This was more difficult to remove than other periphyton, but the programme was continued with to keep this a at low level as much as possible.
Recently, (2025) mitigation measures undertaken have been modified and largely improvements in river ecosystem have been observed. Continued improvements in the management of the lower Waiau River are needed to keep the river in a healthy state. Didymo abundance has generally been reduced although Microcoleus (a toxic blue green alga) has become more abundant. The WWP has long advocated for higher lake levels in the autumn so that required flushing flows are available. The management of the long-finned eel (tuna) population in the lake is also in need of review to ensure these fish have the best chance of surviving in this environment.
Meridian has met the costs of research and monitoring throughout the life of the WWP. WWP members have donated thousands of hours of study and meeting time as well. Several members have passed on, notably Jan Riddell, who was the major driving force and leader of the WWP for most of the years of its existence.